Launching a SaaS is more than coding. It's validating, selling, measuring. Here is the checklist we wish we had before our first launch — usable as a step-by-step guide from idea to first MRR.
Phase 1: Validation (week 0-2)
- ☐ Interview 10 prospects about their actual pain point
- ☐ Build a pre-sale landing page with waitlist
- ☐ Buy the domain (.com preferred)
- ☐ Collect 50 emails minimum before writing any code
- ☐ Test the offer with 3 payment promises
Phase 2: MVP (week 2-6)
- ☐ Start with a boilerplate (not from scratch)
- ☐ Auth + payment + 1 core feature, that's it
- ☐ Brand with a simple Figma logo
- ☐ Deploy on Vercel from day 1
- ☐ Onboard 5 beta testers manually
Phase 3: Launch (week 6-8)
- ☐ Prepare a Product Hunt page + assets (demo GIF, logo, screenshots)
- ☐ Write a launch post for Twitter / LinkedIn / Reddit r/SaaS
- ☐ Enable Cloudflare Turnstile (anti-bot)
- ☐ Wire Sentry + analytics
- ☐ Configure Stripe in production + test webhook
- ☐ Issue the first invoice before public launch
Phase 4: First MRR (week 8-12)
- ☐ Optimize the conversion funnel (Stripe Checkout, urgency)
- ☐ Launch a newsletter (Brevo) with 1 send/week
- ☐ Write 2-3 targeted SEO articles (long-tail)
- ☐ Request testimonials from first customers
- ☐ Measure: MRR, churn, CAC, LTV
Phase 5: Iteration (month 3+)
- ☐ Pick 1 growth lever (SEO, ads, partnerships)
- ☐ Double down on what works, cut the rest
- ☐ Hire when you can no longer do everything solo
- ☐ Think about taxes (Lemon Squeezy vs Stripe + accountant)
Pitfalls to avoid
- Coding for 6 months with zero users
- Over-engineering foundations (microservices at 0 users)
- Doing marketing only after launch
- Forgetting international taxes
Phase 2 starts today: Boilerplate-Stack covers the first 4 weeks of your MVP in a few hours. Auth, payments, multi-tenant, security, i18n — everything ready.
Conclusion
Launching is no mystery. It's a checklist. The discipline to execute matters more than the quality of the idea. Boilerplate-Stack gives you the technical base to move fast.